On March 30, 2016, the Supreme Court of Canada heard argument in the appeal of the Alberta Court of Appeal’s decision in Ledcor v Northbridge Indemnity Insurance Company. In doing so, the SCC was asked to consider, among other things, the proper test to distinguish between the concepts of “faulty workmanship” and “resulting damage” in comprehensive builders’ risk policies.
The dispute in this case arose in relation to the construction of the EPCOR Tower, a 29 storey office building in Edmonton, Alberta, completed in 2011. The owner, Station Lands Ltd. (“Station Lands”) retained Ledcor Construction Ltd. (“Ledcor”) as a construction manager to coordinate construction of the building. An “All Risks” policy was obtained by Station Lands from a number of insurers to cover all “direct physical loss or damage” subject to certain defined exclusions. The policy named both Station Lands and Ledcor as insureds, and the additional insureds included the owners, contractors, sub-contractors, architects, engineers, consultants, and all individuals or firms providing services or materials to or for the named insureds.
As the building was nearing completion, Station Lands hired a contractor, Bristol Cleaning (“Bristol”), to perform a “construction clean” of the exterior of the building to remove dirt, paint and other construction debris from the windows. During the cleaning process, a number of the windows were damaged due to Bristol using inappropriate tools and methods and had to be replaced at considerable cost.
As a result of the damage to the windows, Station Lands and Ledcor made claims under the policy for the costs incurred to replace the windows. The insurers denied the claims on the grounds that the damage was “faulty workmanship” and was therefore captured by an exclusion:
- The loss is first reviewed to see whether it falls within the general coverage afforded under the policy;
- The exclusions of the policy are then considered to see whether any apply; and
- Finally, the court must consider whether the loss is within an exception to a given exclusion clause.
Significantly, however, the CA noted that as the exclusion clause at issue juxtaposed the excluded “cost of making good faulty workmanship” with “resulting damage,” which was covered, the exception and exclusion were akin to two sides of the same coin and therefore had to be interpreted symbiotically.
In allowing the appeal, the CA rejected the main arguments asserted by Station Lands and Ledcor: that the cleaning by Bristol was not within the phrase “workmanship,” which the insureds stated only covers efforts that result in the creation of a physical product; and secondly, that the exclusion did not apply to damage caused by one contractor to the work of another.
With respect to the first issue, the CA found that such a narrow interpretation was outside the normal interpretation of the word “workmanship,” which encompassed any application of skill or effort to a task. The court also observed that the construction contract itself defined “Work” as including “services,” and referred to the “workmanship” of Bristol, such that the final cleaning of the building exterior was as much a part of the construction as the pouring of the concrete. Moreover, the CA held that the insureds’ argument was not supported by the wording of the policy itself given there was nothing to indicate that only the creation of physical work products was caught by the term “workmanship,” particularly as the policy covered all consultants and trade contractors involved in the project, such that it would be inconsistent to then find that the consultants and contractors who did not actually create physical products were not covered.
The CA also rejected the second argument advanced by the insureds, finding that it was artificial to draw a dividing line between the work product created by the work of other contractors, and the work performed by Bristol. Specifically, the CA held that the insureds’ argument would lead to the conclusion that coverage under the policy depended on how the work was divided up, with coverage effectively expanded the more finely divided up the work was, and narrowed or even vitiated if a single contractor did all the work associated with one component of the project.
Ultimately, the court favored the general approach proffered by the insurers; namely, that if the workmanship itself directly caused the damage, then both re-doing the work and fixing the damage from the first attempt fall into the expression “making good faulty workmanship.” The CA concluded that the proper test to be applied in determining whether the exclusion clause applies is one of connectedness between the work, the damage and the physical object being worked upon, and that the primary considerations will be:
- The extent or degree to which the damage was to a portion of the project actually being worked on at the time, or was collateral damage to other areas;
- The nature of the work being done, how the damage related to the way that work is normally done, and the extent to which the damage is a natural or foreseeable consequence of the work itself; and
- Whether the damage was within the purview of normal risks of poor workmanship, or whether it was unexpected and fortuitous.
Finally, the CA did not agree with the trial judge’s application of contra proferentem in the circumstances as that doctrine could not be used to create ambiguity and the Supreme Court of Canada had previously held that this type of exclusion was not ambiguous.
As the Supreme Court of Canada has recognized, builders’ risk insurance is essential for the administration of construction projects as it reduces the overall insurance costs by reducing the overlaps in coverage, which in turn serves to eliminate litigation amongst insurers over which particular subcontractor was responsible for any particular damage. Leave to appeal to the SCC is rarely attained, with only approximately 12% of applications granted over the last 10 years. As such, the significance of determining the proper approach to the interpretation of this important and ubiquitous provision is demonstrated by the SCC’s decision to grant leave in this case. The construction industry and insurers alike anxiously await further guidance on this issue from Canada’s highest court.
[1] Ledcor Construction Limited v Northbridge Indemnity Insurance Company, 2015 ABCA 121 (CanLII)
[2] Ledcor Construction Limited v. Northbridge Indemnity Insurance Company, 2013 ABQB 585 (CanLII) at para. 13.
[3] A principle of contractual interpretation requiring ambiguous provisions capable of more than one interpretation to be construed against the party responsible for drafting the contract.
[4] Supra note 1 at para. 16, citing Progressive Homes Ltd. v Lombard General Insurance Co. of Canada, [2010] 2 SCR 245, 2010 SCC 33 (CanLII)
[5] Ibid. at para. 26
[6] Ibid. at para. 50
[7] Citing Canadian National Railway Co. v Royal and SunAlliance Insurance Co. of Canada, 2008 SCC 66 (CanLII)
[8] Commonwealth Construction Co. Ltd. v. Imperial Oil Ltd. et al., [1978] 1 SCR 317